A. a straight line
B. a number enclosed in a circle or a square
C. a straight line with circles at the ends
D. a dotted line
E. an arrow
Related Mcqs:
- The time of completing a project in network analysis is given by following time of the critical activity meeting at the finalitiode_________________?
A. early finish
B. early start
C. late start
D. late finish
E. none of the above - The critical path of a network represents_______________________?
A. the minimum time required for completion of project
B. the maximum time required for completion of project
C. maximum cost required for completion of project
D. minimum cost required for completion of project
E. none of the above - Material handling in automobile industry is done by_________________?
A. overhead crane
B. trolley
C. belt conveyor
D. all of the above
E. none of the above - If TL is the largest allowable event occurrence time, total activity slack (s) is equal to__________________?
A. latest start time – earliest start time
B. latest finish time – earliest finish time (EFT)
C. TL-EFT
D. all of the above
E. none of the above - Activity s,lack or float of any event on a PERT/CPM chart is represented by__________________?
A. latest start time of succeeding event -earliest finish time of preceding event activity time
B. latest start time of the event – earliest start time of the event
C. latest finish time of event – earliest finish time of the event
D. anyone of the above
E. none of the above - In the Halsey system of wage incentive plan, a worker is ________________?
A. paid as per efficiency
B. ensured of minimum wages
C. not paid any bonus till his efficiency
D. never a loser
E. induced to do more work - In steel plant the most important system for materials handling is_____________________?
A. conveyors
B. cranes and hoists
C. trucks
D. locos
E. none of the above - PMTP (predetermined motion time systems) include___________________?
A. MTM (method time measurement)
B. WFS (work factor systems)
C. BNTS (basic motion time study)
D. all of the above
E. none of the above - The assumption in PERT is__________________?
A. a project will always be behind schedule, if left uncorrected
B. cost of project will always be more than the estimated cost, if no timely corrections are taken
C. a project can be subdivided into a set of predictable, independent activities
D. activities are fixed and can’t be changed ,
E. commissioning time can be changed, if activities are behind schedule - The linear programming techniques can be applied successfully to industries like_________________?
A. iron and steel
B. food processing
C. oil and chemical
D. banking
E. all of the above