A. iron and steel
B. food processing
C. oil and chemical
D. banking
E. all of the above
Related Mcqs:
- In order that linear programming techniques provide valid results________________?
A. relations between factors must be linear (positive)
B. relations between factors must be linear (negative)
C. A. or B.
D. only one factor should change at a time, others remaining constant
E. none of the above - Statistical quality control techniques are based on the theory of___________________?
A. quality
B. statistics
C. probability
D. all of the above
E. none of the above - PERT/CPM, techniques can be used for following applications____________________?
A. once through project
B. maintenance jobs
C. research and development
D. all non-technical jobs
E. all of the above - Descripancies of bar chart techniques are________________?
A. consequential effects of lack in one activity on omer
B. consequential effects of lack in one activity on the finish date
C. free time available for an activity can’t be predicted
D. effective monitoring/controlling can’t be done
E. all of the above - Job enrichment technique is applied to_________________?
A. reduce labour monotony
B. overcome boring and demotivating work
C. make people happy
D. all of the above
E. none of the above - The technique of value analysis can be applied to____________________?
A. complicated items only
B. simple items only
C. crash programmer items only
D. cost consciousness items only
E. any item - Pick up the correct statement from the following?
A. the float may be positive, zero or negative
B. if the float is positive and the activity is delayed by a period equal to its total float, the completion of project in not delayed
C. if the float of an activity is negative, delay in its performance is bound to delay the completion of project
D. if the float of an activity is zero, the activity is critical and any delay in its performance will delay the whole project
E. all of the above - The critical path of a network represents_______________________?
A. the minimum time required for completion of project
B. the maximum time required for completion of project
C. maximum cost required for completion of project
D. minimum cost required for completion of project
E. none of the above - In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if_________________?
A. complete details’of items in, waiting line are known
B. arrival and waiting times are known and can be grouped to form a waiting line model
C. all variables and constants are known and form a linear equation
D. the laws governing arrivals, service times, and the order in which the arriving units are taken into source are known
E. all of the above - One of the basic essentials of an incentive plan is that_________________?
A. a differential piece rate system should exist
B. minimum wages should be guaranteed
C. provide incentive to group efficiency performance
D. all standards should be based on optimum standards of production
E. all standards should be based on time studies