A. quality
B. statistics
C. probability
D. all of the above
E. none of the above
Related Mcqs:
- In order that linear programming techniques provide valid results________________?
A. relations between factors must be linear (positive)
B. relations between factors must be linear (negative)
C. A. or B.
D. only one factor should change at a time, others remaining constant
E. none of the above - PERT/CPM, techniques can be used for following applications____________________?
A. once through project
B. maintenance jobs
C. research and development
D. all non-technical jobs
E. all of the above - Descripancies of bar chart techniques are________________?
A. consequential effects of lack in one activity on omer
B. consequential effects of lack in one activity on the finish date
C. free time available for an activity can’t be predicted
D. effective monitoring/controlling can’t be done
E. all of the above - The linear programming techniques can be applied successfully to industries like_________________?
A. iron and steel
B. food processing
C. oil and chemical
D. banking
E. all of the above - The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as_________________?
A. Dry work Plan
B. Halsey Premium Plan
C. Taylor Plan
D. Bedaux Plan
E. Rowan Plan - PERT analysis is based on____________________?
A. optimistic time
B. pessimistic time
C. most likely time
D. all of the above
E. none of the above - Queuing theory deals with problems of________________?
A. material handling
B. reducing the waiting time or idle Jajme
C. better utilization of man services
D. effective use of machines
E. none of the above. - Queuing theory is used for____________________?
A. inventory problems
B. traffic congestion studies
C. job-shop scheduling
D. all of the above
E. none of the above - Queuing theory is associated with __________________?
A. sales
B. inspection time
C. waiting time
D. production time
E. inventory - In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if_________________?
A. complete details’of items in, waiting line are known
B. arrival and waiting times are known and can be grouped to form a waiting line model
C. all variables and constants are known and form a linear equation
D. the laws governing arrivals, service times, and the order in which the arriving units are taken into source are known
E. all of the above