A. conveyors
B. cranes and hoists
C. trucks
D. locos
E. none of the above
Related Mcqs:
- The most important objective behind plant layout is_____________________?
A. overall simplification, safety of integration
B. economy in space
C. maximum travel time in plant
D. to provide conveniently located shops
E. to avoid any bottlenecks - Material handling and plant location is analysed by________________?
A. Gnatt chart
B. bin chart
C. Emerson chart
D. travel chart
E. activity chart - Material handling in automobile industry is done by_________________?
A. overhead crane
B. trolley
C. belt conveyor
D. all of the above
E. none of the above - For a product layout the material handling equipment must _________________?
A. have full flexibility
B. employ conveyor belts, trucks, tractors etc.
C. be a general purpose type
D. be designed as special purpose for a particular application
E. arranging shops according to specialization of duties - Which of the following organisations is best suited for steel plants__________________?
A. functional organisation
B. line organisation
C. staff organisation
D. line, staff and functional organisations
E. scalar organisation - The important file in making a PERT is__________________?
A. an event can’t be accomplished until activities leading to it are completed
B. no activity from any event can be started from preceding event till it is completed
C. length of arrow has nothing to do with time
D. every activity must be completed before end point is reached
E. all of the above - Which of the following is independent of sales forecast______________?
A. productivity
B. inventory control
C. production planning
D. production control
E. capital budgeting - The objective of time study is to determine the time required to complete a job by_______________?
A. fast worker
B. average worker
C. slow worker
D. new entrant
E. any one of the above - Choose the wrong statement Time study is used to_________________?
A. determine overhead expenses
B. provide a basis for setting piece prices or incentive wages
C. determine standard costs
D. determine the capability of an operator to handle the number of machines
E. compare alternative methods - If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good______________________?
A. EF=ES+D
B. LS=LF-D
C. LF = LS + D
D. D = EF-ES
E. all of the above