A. overall simplification, safety of integration
B. economy in space
C. maximum travel time in plant
D. to provide conveniently located shops
E. to avoid any bottlenecks
Related Mcqs:
- In steel plant the most important system for materials handling is_____________________?
A. conveyors
B. cranes and hoists
C. trucks
D. locos
E. none of the above - For a product layout the material handling equipment must _________________?
A. have full flexibility
B. employ conveyor belts, trucks, tractors etc.
C. be a general purpose type
D. be designed as special purpose for a particular application
E. arranging shops according to specialization of duties - Product layout is employed for____________________?
A. batch production
B. continuous production
C. effective utilization of machine
D. all of the above
E. none of the above - The process layout is best suited where______________?
A. specialisation exists
B. machines are arranged according to sequence of operation
C. few number of non-standardised units are to be produced
D. mass production is envisaged
E. bought out items are more - For ship vessel industry the following layout is best suited_________________?
A. process layout
B. product layout
C. fixed position layout
D. plant layout
E. functional layout - Process layout is employed for_________________?
A. batch production
B. continuous type of product
C. effective utilisation of machines
D. all of the above
E. none of the above - The disadvantage of product layout is_________________?
A. high initial investment for the specialized facilities
B. skilled labour to operate machines
C. production time is longer, requiring more goods in inventory
D. high cost of inspection
E. costly and complex production control - The objective of time study is to determine the time required to complete a job by_______________?
A. fast worker
B. average worker
C. slow worker
D. new entrant
E. any one of the above - Material handling and plant location is analysed by________________?
A. Gnatt chart
B. bin chart
C. Emerson chart
D. travel chart
E. activity chart - The important file in making a PERT is__________________?
A. an event can’t be accomplished until activities leading to it are completed
B. no activity from any event can be started from preceding event till it is completed
C. length of arrow has nothing to do with time
D. every activity must be completed before end point is reached
E. all of the above