A. fast worker
B. average worker
C. slow worker
D. new entrant
E. any one of the above
Related Mcqs:
- The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as_________________?
A. Rowan Plan
B. Bedaux Plan
C. Taylor Differential Piece rate system
D. Halsey Premium plan
E. Day work plan - The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as_________________?
A. Dry work Plan
B. Halsey Premium Plan
C. Taylor Plan
D. Bedaux Plan
E. Rowan Plan - The difference between the time available to do the job and the time required to do the job, is known as_________________?
A. event
B. float
C. duration
D. constraint
E. none of the above - In micromotion study, therblig is described by_______________?
A. a symbol
B. an event
C. an activity
D. micro motions
E. standard symbol and colour - The most important objective behind plant layout is_____________________?
A. overall simplification, safety of integration
B. economy in space
C. maximum travel time in plant
D. to provide conveniently located shops
E. to avoid any bottlenecks - The artificial activity; which indicates that an activity following it cannot be started unless, the preceding activity is complete, is known as_________________?
A. event
B. free float
C. artificial
D. constraint
E. dummy - Job evaluation is the method-of determining the________________?
A. relative worth of jobs
B. skills required by a worker
C. contribution of a worker
D. contribution of a job
E. effectiveness of various alternatives - Job enrichment technique is applied to_________________?
A. reduce labour monotony
B. overcome boring and demotivating work
C. make people happy
D. all of the above
E. none of the above - The standard time for a job is_________________?
A. total work content
B. base time + relaxation time
C. total work content + basic time
D. total work content + delay contingency allowance
E. total work content + relaxation time - The allowed time for a job equals standard time plus___________________?
A. policy allowance
B. interference allowance
C. process allowance
D. learning allowance
E. unforeseen allowance