A. Gnatt chart
B. bin chart
C. Emerson chart
D. travel chart
E. activity chart
Related Mcqs:
- In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if_________________?
A. complete details’of items in, waiting line are known
B. arrival and waiting times are known and can be grouped to form a waiting line model
C. all variables and constants are known and form a linear equation
D. the laws governing arrivals, service times, and the order in which the arriving units are taken into source are known
E. all of the above - In steel plant the most important system for materials handling is_____________________?
A. conveyors
B. cranes and hoists
C. trucks
D. locos
E. none of the above - Material handling in automobile industry is done by_________________?
A. overhead crane
B. trolley
C. belt conveyor
D. all of the above
E. none of the above - For a product layout the material handling equipment must _________________?
A. have full flexibility
B. employ conveyor belts, trucks, tractors etc.
C. be a general purpose type
D. be designed as special purpose for a particular application
E. arranging shops according to specialization of duties - The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store_______________?
A. inflated system
B. primary cost method
C. current value method
D. fixed price method
E. variable price method - The most important objective behind plant layout is_____________________?
A. overall simplification, safety of integration
B. economy in space
C. maximum travel time in plant
D. to provide conveniently located shops
E. to avoid any bottlenecks - In the perpetual inventory control, the material is checked when it reaches its________________?
A. minimum value
B. maximum value
C. average value
D. alarming value
E. original value - In perpetual inventory control, the material is checked as it reaches its__________________?
A. minimum value
B. maximum value
C. average value
D. middle value
E. alarming value - If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good______________________?
A. EF=ES+D
B. LS=LF-D
C. LF = LS + D
D. D = EF-ES
E. all of the above - The difference between the time available to do the job and the time required to do the job, is known as_________________?
A. event
B. float
C. duration
D. constraint
E. none of the above