A. Gnatt chart
B. bin chart
C. Emerson chart
D. travel chart
E. activity chart
Advertisement
Related Mcqs:
- In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if_________________?
- A. complete details’of items in, waiting line are known B. arrival and waiting times are known and can be grouped to form a waiting line model C. all variables and constants are known and form a linear equation D. the laws governing arrivals, service times, and the order in which the arriving units are taken...
- In steel plant the most important system for materials handling is_____________________?
- A. conveyors B. cranes and hoists C. trucks D. locos E. none of the above...
- Material handling in automobile industry is done by_________________?
- A. overhead crane B. trolley C. belt conveyor D. all of the above E. none of the above...
- For a product layout the material handling equipment must _________________?
- A. have full flexibility B. employ conveyor belts, trucks, tractors etc. C. be a general purpose type D. be designed as special purpose for a particular application E. arranging shops according to specialization of duties...
- The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store_______________?
- A. inflated system B. primary cost method C. current value method D. fixed price method E. variable price method...
- The most important objective behind plant layout is_____________________?
- A. overall simplification, safety of integration B. economy in space C. maximum travel time in plant D. to provide conveniently located shops E. to avoid any bottlenecks...
- In the perpetual inventory control, the material is checked when it reaches its________________?
- A. minimum value B. maximum value C. average value D. alarming value E. original value...
- In perpetual inventory control, the material is checked as it reaches its__________________?
- A. minimum value B. maximum value C. average value D. middle value E. alarming value...
- If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good______________________?
- A. EF=ES+D B. LS=LF-D C. LF = LS + D D. D = EF-ES E. all of the above...
- The difference between the time available to do the job and the time required to do the job, is known as_________________?
- A. event B. float C. duration D. constraint E. none of the above...