A. overhead crane
B. trolley
C. belt conveyor
D. all of the above
E. none of the above
Advertisement
Related Mcqs:
- For a product layout the material handling equipment must _________________?
- A. have full flexibility B. employ conveyor belts, trucks, tractors etc. C. be a general purpose type D. be designed as special purpose for a particular application E. arranging shops according to specialization of duties...
- Material handling and plant location is analysed by________________?
- A. Gnatt chart B. bin chart C. Emerson chart D. travel chart E. activity chart...
- Which of the following organisation is preferred in automobile industry________________?
- A. functional organisation B. line organisation C. staff organisation D. line and staff organisations E. scalar organisation...
- In steel plant the most important system for materials handling is_____________________?
- A. conveyors B. cranes and hoists C. trucks D. locos E. none of the above...
- The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store_______________?
- A. inflated system B. primary cost method C. current value method D. fixed price method E. variable price method...
- An event is indicated on the network by_________________?
- A. a straight line B. a number enclosed in a circle or a square C. a straight line with circles at the ends D. a dotted line E. an arrow...
- For ship vessel industry the following layout is best suited_________________?
- A. process layout B. product layout C. fixed position layout D. plant layout E. functional layout...
- Work study is done with the help of_______________?
- A. process chart B. material handling C. stop watch D. all of the above E. none of the above...
- In the perpetual inventory control, the material is checked when it reaches its________________?
- A. minimum value B. maximum value C. average value D. alarming value E. original value...
- In perpetual inventory control, the material is checked as it reaches its__________________?