A. MTM (method time measurement)
B. WFS (work factor systems)
C. BNTS (basic motion time study)
D. all of the above
E. none of the above
Related Mcqs:
- Motion study is used for________________?
Choose the wrong statement?
A. improving a work method
B. improvising a work method
C. designing a work method
D. providing a schematic framework
E. reducing inventory costs - Motion study involves analysis of________________?
A. actions of operator
B. layout of work place
C. tooling and equipment
D. all of the above
E. none of the above - Basic motion time study gives times for basic motions in ten thousandths of_______________?
A. second
B. minute
C. hour
D. day
E. none of the above - Micro motion study is__________________?
A. analysis of a man-work method by using a motion picture camera with a timing device in the field of view
B. motion study* observed on enhanced time intervals
C. motion study of a sequence of operations conducted systematically
D. study of man and machine conducted simultaneously
E. scientific, analytically procedure for determining optimum work method - ABC analysis deals with_________________?
A. analysis of process chart
B. flow of material
C. ordering schedule of job
D. controlling inventory costs money
E. all of the above - In the Halsey system of wage incentive plan, a worker is ________________?
A. paid as per efficiency
B. ensured of minimum wages
C. not paid any bonus till his efficiency
D. never a loser
E. induced to do more work - In steel plant the most important system for materials handling is_____________________?
A. conveyors
B. cranes and hoists
C. trucks
D. locos
E. none of the above - Which of the following equations is not in conformity with others______________?
A. organisation performance x motivation = profits
B. knowledge x skill = ability
C. ability x motivation = performance
D. attitude x situation = motivation
E. performance x resources - The assumption in PERT is__________________?
A. a project will always be behind schedule, if left uncorrected
B. cost of project will always be more than the estimated cost, if no timely corrections are taken
C. a project can be subdivided into a set of predictable, independent activities
D. activities are fixed and can’t be changed ,
E. commissioning time can be changed, if activities are behind schedule - The linear programming techniques can be applied successfully to industries like_________________?
A. iron and steel
B. food processing
C. oil and chemical
D. banking
E. all of the above