A. actions of operator
B. layout of work place
C. tooling and equipment
D. all of the above
E. none of the above
Related Mcqs:
- Motion study is used for________________?
Choose the wrong statement?
A. improving a work method
B. improvising a work method
C. designing a work method
D. providing a schematic framework
E. reducing inventory costs - Basic motion time study gives times for basic motions in ten thousandths of_______________?
A. second
B. minute
C. hour
D. day
E. none of the above - Micro motion study is__________________?
A. analysis of a man-work method by using a motion picture camera with a timing device in the field of view
B. motion study* observed on enhanced time intervals
C. motion study of a sequence of operations conducted systematically
D. study of man and machine conducted simultaneously
E. scientific, analytically procedure for determining optimum work method - Micromotion study involves following number of fundamental hand motions_______________?
A. 8
B. 12
C. 16
D. 20
E. 24 - PMTP (predetermined motion time systems) include___________________?
A. MTM (method time measurement)
B. WFS (work factor systems)
C. BNTS (basic motion time study)
D. all of the above
E. none of the above - Queuing theory deals with problems of________________?
A. material handling
B. reducing the waiting time or idle Jajme
C. better utilization of man services
D. effective use of machines
E. none of the above. - The technique of value analysis can be applied to____________________?
A. complicated items only
B. simple items only
C. crash programmer items only
D. cost consciousness items only
E. any item - The time of completing a project in network analysis is given by following time of the critical activity meeting at the finalitiode_________________?
A. early finish
B. early start
C. late start
D. late finish
E. none of the above - In PERT analysis, critical path is obtained by joining events having___________________?
A. +ve slack
B. -ve slack
C. zero sldck
D. dummy activities
E. critical activities - PERT analysis is based on____________________?
A. optimistic time
B. pessimistic time
C. most likely time
D. all of the above
E. none of the above