A. analysis of a man-work method by using a motion picture camera with a timing device in the field of view
B. motion study* observed on enhanced time intervals
C. motion study of a sequence of operations conducted systematically
D. study of man and machine conducted simultaneously
E. scientific, analytically procedure for determining optimum work method
Related Mcqs:
- Motion study is used for________________?
Choose the wrong statement?
A. improving a work method
B. improvising a work method
C. designing a work method
D. providing a schematic framework
E. reducing inventory costs - Motion study involves analysis of________________?
A. actions of operator
B. layout of work place
C. tooling and equipment
D. all of the above
E. none of the above - Basic motion time study gives times for basic motions in ten thousandths of_______________?
A. second
B. minute
C. hour
D. day
E. none of the above - Time study is__________________?
A. the appraisal, in terms of time, of the value of work involving human effort
B. machine setting time
C. time taken by workers to do a job
D. method of fixing time for workers
E. method of determining the personnel Requirement - Micromotion study is__________________?
A. enlarged view of motion study
B. analysis of one stage of motion study
C. minute and detailed motion study
D. subdivision of an operation into therbligs and their analysis
E. motion study of small components upto mirco-seconds - PMTP (predetermined motion time systems) include___________________?
A. MTM (method time measurement)
B. WFS (work factor systems)
C. BNTS (basic motion time study)
D. all of the above
E. none of the above - The important file in making a PERT is__________________?
A. an event can’t be accomplished until activities leading to it are completed
B. no activity from any event can be started from preceding event till it is completed
C. length of arrow has nothing to do with time
D. every activity must be completed before end point is reached
E. all of the above - The assumption in PERT is__________________?
A. a project will always be behind schedule, if left uncorrected
B. cost of project will always be more than the estimated cost, if no timely corrections are taken
C. a project can be subdivided into a set of predictable, independent activities
D. activities are fixed and can’t be changed ,
E. commissioning time can be changed, if activities are behind schedule - The objective of time study is to determine the time required to complete a job by_______________?
A. fast worker
B. average worker
C. slow worker
D. new entrant
E. any one of the above - Choose the wrong statement Time study is used to_________________?
A. determine overhead expenses
B. provide a basis for setting piece prices or incentive wages
C. determine standard costs
D. determine the capability of an operator to handle the number of machines
E. compare alternative methods