A. the appraisal, in terms of time, of the value of work involving human effort
B. machine setting time
C. time taken by workers to do a job
D. method of fixing time for workers
E. method of determining the personnel Requirement
Related Mcqs:
- Micro motion study is__________________?
A. analysis of a man-work method by using a motion picture camera with a timing device in the field of view
B. motion study* observed on enhanced time intervals
C. motion study of a sequence of operations conducted systematically
D. study of man and machine conducted simultaneously
E. scientific, analytically procedure for determining optimum work method - Micromotion study is__________________?
A. enlarged view of motion study
B. analysis of one stage of motion study
C. minute and detailed motion study
D. subdivision of an operation into therbligs and their analysis
E. motion study of small components upto mirco-seconds - The important file in making a PERT is__________________?
A. an event can’t be accomplished until activities leading to it are completed
B. no activity from any event can be started from preceding event till it is completed
C. length of arrow has nothing to do with time
D. every activity must be completed before end point is reached
E. all of the above - The assumption in PERT is__________________?
A. a project will always be behind schedule, if left uncorrected
B. cost of project will always be more than the estimated cost, if no timely corrections are taken
C. a project can be subdivided into a set of predictable, independent activities
D. activities are fixed and can’t be changed ,
E. commissioning time can be changed, if activities are behind schedule - What does symbol ‘D’ imply in work study ___________________?
A. inspection
B. transport
C. delay/temporary storage
D. permanent storage
E. none of the above - Work study is most useful_______________?
A. where production activities are involved
B. in judging the rating of machines
C. in improving industrial relations
D. in judging the output of a man and improving it
E. where men are biggest contributor to success of a project - In micromotion study, therblig is described by_______________?
A. a symbol
B. an event
C. an activity
D. micro motions
E. standard symbol and colour - Motion study involves analysis of________________?
A. actions of operator
B. layout of work place
C. tooling and equipment
D. all of the above
E. none of the above - Basic motion time study gives times for basic motions in ten thousandths of_______________?
A. second
B. minute
C. hour
D. day
E. none of the above - Work study is concerned with_________________?
A. improving present method and finding standard time
B. motivation of workers
C. improving production capability
D. improving production planning and control
E. all of the above