A. travel and training costs
B. hardware and software costs
C. effort costs (the costs of paying software engineers and managers)
D. all of the mentioned
Explanation: Estimation involves working out how much effort is required to complete each activity and, from this, calculating the total cost of activities.
Related Mcqs:
- Which of the following are parameters involved in computing the total cost of a software development project ?
A. Hardware and software costs
B. Effort costs
C. Travel and training costs
D. All of the mentioned - Which of the following is a project scheduling method that can be applied to software development ?
A. PERT
B. CPM
C. CMM
D. Both PERT and CPM - A software ______________ provides the framework from which a comprehensive plan for software development can be established?
A. people
B. product
C. process
D. none of the mentioned - Which of the following is not an effective software project management focus ?
A. people
B. product
C. popularity
D. process - Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
A. The difficulty of the problem to be solved
B. High frustration caused by personal, business, or technological factors that causes friction among team members
C. The degree of sociability required for the project
D. The rigidity of the delivery date - Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
A. Software Macroscopic schedule
B. Software Project scheduling
C. Software Detailed schedule
D. None of the mentioned - Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - The project planner examines the statement of scope and extracts all important software functions which is known as___________________?
A. Association
B. Decomposition
C. Planning process
D. All of the mentioned - If a Direct approach to software project sizing is taken, size can be measured in__________________?
A. LOC
B. FP
C. LOC and FP
D. None of the mentioned - What is used to determine the recommended degree of rigor with which the software process should be applied on a project ?
A. Degree of Rigor
B. Adaptation criteria
C. Task Set
D. Both degree of Rigor and adaptation criteria