A. people
B. product
C. process
D. none of the mentioned
Explanation: A small number of framework activities are applicable to all software projects, regardless of their size or complexity.
Related Mcqs:
- Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - Which of the following is/are main parameters that you should use when computing the costs of a software development project ?
A. travel and training costs
B. hardware and software costs
C. effort costs (the costs of paying software engineers and managers)
D. all of the mentioned - Which of the following are parameters involved in computing the total cost of a software development project ?
A. Hardware and software costs
B. Effort costs
C. Travel and training costs
D. All of the mentioned - Which of the following is a project scheduling method that can be applied to software development ?
A. PERT
B. CPM
C. CMM
D. Both PERT and CPM - Which of the following is incorrect activity for the configuration management of a software system ?
A. Internship management
B. Change management
C. Version management
D. System management - Which software project sizing approach develop estimates of the information domain characteristics ?
A. Function point sizing
B. Change sizing
C. Standard component sizing
D. Fuzzy logic sizing - Which of the following is not an approach to software cost estimation ?
A. Empirical
B. Heuristic
C. Analytical
D. Critical - Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
A. The difficulty of the problem to be solved
B. High frustration caused by personal, business, or technological factors that causes friction among team members
C. The degree of sociability required for the project
D. The rigidity of the delivery date - What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project ?
A. Task set
B. Degree of milestone
C. Adaptation criteria
D. All of the mentioned