A. Task set
B. Degree of milestone
C. Adaptation criteria
D. All of the mentioned
Advertisement
Related Mcqs:
- Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks ?
- A. Controlled decentralized (CD) B. Democratic decentralized (DD) C. Controlled centralized (CC) D. None of the mentioned...
- Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
- A. Software Macroscopic schedule B. Software Project scheduling C. Software Detailed schedule D. None of the mentioned...
- Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
- A. Early design stage model B. Post-architecture-stage model C. Application composition model D. All of the mentioned...
- Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
- A. The difficulty of the problem to be solved B. High frustration caused by personal, business, or technological factors that causes friction among team members C. The degree of sociability required for the project D. The rigidity of the delivery date...
- Which software engineering team has no permanent leader ?
- A. Controlled decentralized (CD) B. Democratic decentralized (DD) C. Controlled Centralized (CC) D. None of the mentioned...
- Which of the following is a collection of project coordination technique ?
- A. Formal approaches B. Formal, interpersonal procedures C. Informal, interpersonal procedures D. All of the mentioned...
- A software ______________ provides the framework from which a comprehensive plan for software development can be established?
- A. people B. product C. process D. none of the mentioned...
- The project planner examines the statement of scope and extracts all important software functions which is known as___________________?
- A. Association B. Decomposition C. Planning process D. All of the mentioned...
- A _______________ is developed using historical cost information that relates some software metric to the project cost ?
- A. Algorithmic cost modelling B. Expert judgement C. Estimation by analogy D. Parkinsonโs Law...
- If a Direct approach to software project sizing is taken, size can be measured in__________________?
- A. LOC B. FP C. LOC and FP D. None of the mentioned...
Advertisement