A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned
Related Mcqs:
- Which model is used during early stages of the system design after the requirements have been established ?
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model - Which of the following term is best defined by the statement: “The underlying technology on which the system is built is superseded by new technology.” ?
A. Technology change
B. Product competition
C. Requirements change
D. None of the mentioned - Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks ?
A. Controlled decentralized (CD)
B. Democratic decentralized (DD)
C. Controlled centralized (CC)
D. None of the mentioned - Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
A. The difficulty of the problem to be solved
B. High frustration caused by personal, business, or technological factors that causes friction among team members
C. The degree of sociability required for the project
D. The rigidity of the delivery date - Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
A. Software Macroscopic schedule
B. Software Project scheduling
C. Software Detailed schedule
D. None of the mentioned - Which software engineering team has no permanent leader ?
A. Controlled decentralized (CD)
B. Democratic decentralized (DD)
C. Controlled Centralized (CC)
D. None of the mentioned - What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project ?
A. Task set
B. Degree of milestone
C. Adaptation criteria
D. All of the mentioned - A software ______________ provides the framework from which a comprehensive plan for software development can be established?
A. people
B. product
C. process
D. none of the mentioned - What combines procedures and tools to manage different versions of configuration objects that are created during the software process ?
A. Change control
B. Version control
C. SCIs
D. None of the mentioned - What evaluates the risk associated with the technology to be implemented as part of project scope ?
A. Concept scoping
B. Preliminary concept planning
C. Technology risk assessment
D. Customer reaction to the concept