A. Software Macroscopic schedule
B. Software Project scheduling
C. Software Detailed schedule
D. None of the mentioned
Related Mcqs:
- Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks ?
A. Controlled decentralized (CD)
B. Democratic decentralized (DD)
C. Controlled centralized (CC)
D. None of the mentioned - What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project ?
A. Task set
B. Degree of milestone
C. Adaptation criteria
D. All of the mentioned - Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
A. The difficulty of the problem to be solved
B. High frustration caused by personal, business, or technological factors that causes friction among team members
C. The degree of sociability required for the project
D. The rigidity of the delivery date - Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - What is the recommended distribution of effort for a project ?
A. 40-20-40
B. 50-20-30
C. 30-40-30
D. 50-30-20 - Which software engineering team has no permanent leader ?
A. Controlled decentralized (CD)
B. Democratic decentralized (DD)
C. Controlled Centralized (CC)
D. None of the mentioned - Which of the following is incorrect activity for the configuration management of a software system ?
A. Internship management
B. Change management
C. Version management
D. System management - Which of the following is not a Software Configuration Management Activity ?
A. Configuration item identification
B. Risk management
C. Release management
D. Branch management - Which of the following is/are main parameters that you should use when computing the costs of a software development project ?
A. travel and training costs
B. hardware and software costs
C. effort costs (the costs of paying software engineers and managers)
D. all of the mentioned - Which of the following is not an effective software project management focus ?
A. people
B. product
C. popularity
D. process