A. Hardware and software costs
B. Effort costs
C. Travel and training costs
D. All of the mentioned
Explanation: All these are accounted for in estimating a software development cost
Related Mcqs:
- Which of the following is/are main parameters that you should use when computing the costs of a software development project ?
A. travel and training costs
B. hardware and software costs
C. effort costs (the costs of paying software engineers and managers)
D. all of the mentioned - A _______________ is developed using historical cost information that relates some software metric to the project cost ?
A. Algorithmic cost modelling
B. Expert judgement
C. Estimation by analogy
D. Parkinson’s Law - Which of the following is a project scheduling method that can be applied to software development ?
A. PERT
B. CPM
C. CMM
D. Both PERT and CPM - A software ______________ provides the framework from which a comprehensive plan for software development can be established?
A. people
B. product
C. process
D. none of the mentioned - Which of the following is not an effective software project management focus ?
A. people
B. product
C. popularity
D. process - Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
A. The difficulty of the problem to be solved
B. High frustration caused by personal, business, or technological factors that causes friction among team members
C. The degree of sociability required for the project
D. The rigidity of the delivery date - Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
A. Software Macroscopic schedule
B. Software Project scheduling
C. Software Detailed schedule
D. None of the mentioned - Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - The project planner examines the statement of scope and extracts all important software functions which is known as___________________?
A. Association
B. Decomposition
C. Planning process
D. All of the mentioned - The environment that supports the software project is called_______________________?
A. CLSS
B. SEE
C. FAST
D. CBSE