A. LOC
B. FP
C. LOC and FP
D. None of the mentioned
Explanation: LOC or Line of Code is a direct measure to estimate project size.
Related Mcqs:
- Which software project sizing approach develop estimates of the information domain characteristics ?
A. Function point sizing
B. Change sizing
C. Standard component sizing
D. Fuzzy logic sizing - If an Indirect approach is taken, then the sizing approach is represented as_______________?
A. LOC
B. FP
C. Fuzzy Logic
D. LOC and FP - Who suggested the four different approaches to the sizing problem ?
A. Putnam
B. Myers
C. Boehm
D. Putnam and Myers - Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - A software ______________ provides the framework from which a comprehensive plan for software development can be established?
A. people
B. product
C. process
D. none of the mentioned - Which of the following is not an approach to software cost estimation ?
A. Empirical
B. Heuristic
C. Analytical
D. Critical - The project planner examines the statement of scope and extracts all important software functions which is known as___________________?
A. Association
B. Decomposition
C. Planning process
D. All of the mentioned - A _______________ is developed using historical cost information that relates some software metric to the project cost ?
A. Algorithmic cost modelling
B. Expert judgement
C. Estimation by analogy
D. Parkinson’s Law - Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
A. Software Macroscopic schedule
B. Software Project scheduling
C. Software Detailed schedule
D. None of the mentioned - What is used to determine the recommended degree of rigor with which the software process should be applied on a project ?
A. Degree of Rigor
B. Adaptation criteria
C. Task Set
D. Both degree of Rigor and adaptation criteria