A. that can’t be analysed mathematically
B. involving multistage queuing
C. to verify mathematical results
D. all of the above
E. none of the above
Related Mcqs:
- Queuing theory deals with problems of________________?
A. material handling
B. reducing the waiting time or idle Jajme
C. better utilization of man services
D. effective use of machines
E. none of the above. - Queuing theory is used for____________________?
A. inventory problems
B. traffic congestion studies
C. job-shop scheduling
D. all of the above
E. none of the above - Queuing theory is associated with __________________?
A. sales
B. inspection time
C. waiting time
D. production time
E. inventory - In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if_________________?
A. complete details’of items in, waiting line are known
B. arrival and waiting times are known and can be grouped to form a waiting line model
C. all variables and constants are known and form a linear equation
D. the laws governing arrivals, service times, and the order in which the arriving units are taken into source are known
E. all of the above - Statistical quality control techniques are based on the theory of___________________?
A. quality
B. statistics
C. probability
D. all of the above
E. none of the above - Basic tool in work study is __________________?
A. graph paper
B. process chart
C. planning chart
D. stop watch
E. analytical mind - In the perpetual inventory control, the material is checked when it reaches its________________?
A. minimum value
B. maximum value
C. average value
D. alarming value
E. original value - Material handling and plant location is analysed by________________?
A. Gnatt chart
B. bin chart
C. Emerson chart
D. travel chart
E. activity chart - What does symbol ‘V’ employ in work study________________?
A. operation
B. inspection
C. delay/ temporary Storage
D. permanent storage
E. none of the above - Pick up the incorrect statement from the following. A critical ratio scheduling____________________?
A. establishes the relative priorities among various activities on a common basis
B. determines the status of each activity
C. adjusts automatically changes in activity progress
D. is a dynamic system
E. none of the above