A. operation
B. inspection
C. delay/ temporary Storage
D. permanent storage
E. none of the above
Related Mcqs:
- What does symbol ‘O’ imply in work study________________?
A. operation
B. inspection
C. transport
D. delay/temporary storage
E. none of the above - What does symbol ‘D’ imply in work study ___________________?
A. inspection
B. transport
C. delay/temporary storage
D. permanent storage
E. none of the above - Basic tool in work study is __________________?
A. graph paper
B. process chart
C. planning chart
D. stop watch
E. analytical mind - Work study is most useful_______________?
A. where production activities are involved
B. in judging the rating of machines
C. in improving industrial relations
D. in judging the output of a man and improving it
E. where men are biggest contributor to success of a project - Work study is done with the help of_______________?
A. process chart
B. material handling
C. stop watch
D. all of the above
E. none of the above - Pick up the incorrect statement about advantages of work sampling_________________?
A. permits a fine breakdown of activities and delays
B. simultaneous study of many operators may be made by a single observer
C. calculations are easier, method is economical and less time consuming
D. no time measuring devices are generally needed
E. as operators are not watched for long periods, chances of obtaining misleading results are less - Work sampling observations are taken on the basis of_______________?
A. detailed calculations
B. convenience
C. table of random numbers
D. past experience
E. fixed percentage of daily production - Work study is concerned with_________________?
A. improving present method and finding standard time
B. motivation of workers
C. improving production capability
D. improving production planning and control
E. all of the above - Critical Path Net Work helps an engineer_________________?
A. to concentrate his attention on critical activities
B. to divert the resources from non-critical advanced activities to critical activities
C. to be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
D. all of the above
E. none of the above - Work study comprises following main techniques_________________?
A. method study and work measurement
B. method study and time study
C. time study and work measurement
D. method study and job evaluation
E. value analysis and work measurement