A. detailed calculations
B. convenience
C. table of random numbers
D. past experience
E. fixed percentage of daily production
Related Mcqs:
- Work study is done with the help of_______________?
A. process chart
B. material handling
C. stop watch
D. all of the above
E. none of the above - Acceptance sampling is widely used in________________?
A. batch production
B. job production
C. mass production
D. all of the above
E. none of the above - Merit Rating is the method of determining worth of_______________?
A. a job
B. an individual employee
C. a particular division in workshop
D. machine
E. overall quality - Basic motion time study gives times for basic motions in ten thousandths of_______________?
A. second
B. minute
C. hour
D. day
E. none of the above - The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store_______________?
A. inflated system
B. primary cost method
C. current value method
D. fixed price method
E. variable price method - Basic tool in work study is __________________?
A. graph paper
B. process chart
C. planning chart
D. stop watch
E. analytical mind - What does symbol ‘D’ imply in work study ___________________?
A. inspection
B. transport
C. delay/temporary storage
D. permanent storage
E. none of the above - What does symbol ‘V’ employ in work study________________?
A. operation
B. inspection
C. delay/ temporary Storage
D. permanent storage
E. none of the above - What does symbol ‘O’ imply in work study________________?
A. operation
B. inspection
C. transport
D. delay/temporary storage
E. none of the above - Work study comprises following main techniques_________________?
A. method study and work measurement
B. method study and time study
C. time study and work measurement
D. method study and job evaluation
E. value analysis and work measurement