A. batch production
B. job production
C. mass production
D. all of the above
E. none of the above
Related Mcqs:
- Work sampling observations are taken on the basis of_______________?
A. detailed calculations
B. convenience
C. table of random numbers
D. past experience
E. fixed percentage of daily production - Micromotion study involves following number of fundamental hand motions_______________?
A. 8
B. 12
C. 16
D. 20
E. 24 - The main advantage of line organisation is its_______________?
A. effective command and control
B. defined responsibilities at all levels
C. rigid discipline in the organisation
D. ability of quick decision at all levels
E. all of the above - The amount deducted from the salary of workers towards employees provident fund is_______________?
A. credited into reserves of company
B. deposited in nationalised bank
C. deposited in post office
D. deposited in the account of worker with employer or Reserve Bank of India
E. deposited in the account of worker with Provident Fund Commissioner - CPM has following time estimate__________________
A. one time estimate
B. two time estimate
C. three time estimate
D. four time estimate
E. nil time estimate - In inventory control, the economic order quantity is the_________________?
A. optimum lot size
B. highest level of inventory
C. lot corresponding to break-even point
D. capability of a plant to produce
E. none of the above - Travel charts provide__________________?
A. an idea of the flow of materials at various stages
B. a compact estimate of the handling which must be done between various work sections
C. the information for changes required in rearranging material handling equipment
D. an approximate estimate of the handling which must be done at a particular station
E. solution to handling techniques to achieve most optimum^ results - The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as_________________?
A. Dry work Plan
B. Halsey Premium Plan
C. Taylor Plan
D. Bedaux Plan
E. Rowan Plan - Slack of various events on the critical path in PERT/CPM chart___________________?
A. increases continuously
B. decreases continuously
C. remains constant
D. may increase or decrease depending on various factors
E. unpredictable - PERT is the__________________?
A. time oriented technique
B. event oriented technique
C. activity oriented technique
D. target oriented technique
E. work oriented technique