A. graph paper
B. process chart
C. planning chart
D. stop watch
E. analytical mind
Related Mcqs:
- Basic motion time study gives times for basic motions in ten thousandths of_______________?
A. second
B. minute
C. hour
D. day
E. none of the above - What does symbol ‘D’ imply in work study ___________________?
A. inspection
B. transport
C. delay/temporary storage
D. permanent storage
E. none of the above - Work study is most useful_______________?
A. where production activities are involved
B. in judging the rating of machines
C. in improving industrial relations
D. in judging the output of a man and improving it
E. where men are biggest contributor to success of a project - Work study is done with the help of_______________?
A. process chart
B. material handling
C. stop watch
D. all of the above
E. none of the above - Work study is concerned with_________________?
A. improving present method and finding standard time
B. motivation of workers
C. improving production capability
D. improving production planning and control
E. all of the above - Work study comprises following main techniques_________________?
A. method study and work measurement
B. method study and time study
C. time study and work measurement
D. method study and job evaluation
E. value analysis and work measurement - In Lincoln plan (one type of group incentive plan), the amount of the profit which an .employee receives in addition to the guaranteed basic _________________?
pay/wages, is based on :
A. a standard rating system
B. a merit rating system
C. a job evaluation system
D. his individual performance
E. all of the above - The simplex method is the basic method for__________________?
A. value analysis
B. operation research
C. linear programming
D. model analysis
E. none of the above - The basic difference between PERT and CPM is that_____________?
A. PERT deals with events and CPM with activities
B. critical path is determined in PERT only
C. costs are considered on CPM only and not in PERT
D. guessed times are used in PERT and evaluated times in CPM
E. PERT is used in workshops and CPM in plants - One of the basic essentials of an incentive plan is that_________________?
A. a differential piece rate system should exist
B. minimum wages should be guaranteed
C. provide incentive to group efficiency performance
D. all standards should be based on optimum standards of production
E. all standards should be based on time studies