A. value analysis
B. operation research
C. linear programming
D. model analysis
E. none of the above
Related Mcqs:
- Graphical method, simplex method, and transportation method are concerned with__________________?
A. break-even analysis
B. value analysis
C. linear programming
D. queing theory
E. tnaterial handling - TMU in method time measurement stands for__________________?
A. time motion unit
B. time measurement unit
C. time movement unit
D. technique measurement unit
E. time method unit - Basic motion time study gives times for basic motions in ten thousandths of_______________?
A. second
B. minute
C. hour
D. day
E. none of the above - Break-even analysis can be used for__________________?
A. short run analysis
B. long run analysis
C. average of above two run analysis
D. there is no such criterion
E. none of the above - Basic tool in work study is __________________?
A. graph paper
B. process chart
C. planning chart
D. stop watch
E. analytical mind - In Lincoln plan (one type of group incentive plan), the amount of the profit which an .employee receives in addition to the guaranteed basic _________________?
pay/wages, is based on :
A. a standard rating system
B. a merit rating system
C. a job evaluation system
D. his individual performance
E. all of the above - The basic difference between PERT and CPM is that_____________?
A. PERT deals with events and CPM with activities
B. critical path is determined in PERT only
C. costs are considered on CPM only and not in PERT
D. guessed times are used in PERT and evaluated times in CPM
E. PERT is used in workshops and CPM in plants - One of the basic essentials of an incentive plan is that_________________?
A. a differential piece rate system should exist
B. minimum wages should be guaranteed
C. provide incentive to group efficiency performance
D. all standards should be based on optimum standards of production
E. all standards should be based on time studies - One time measurement unit (TMU) in method time measurement system equals______________?
A. 0.0001 minute
B. 0.0006 minute
C. 0.006 minute
D. 0.001 minute
E. 0.06 minute - The first method invented for planning projects was________________?
A. bar chart method
B. milestone chart
C. critical path method (CPM)
D. programme evaluation and review technique (PERT)
E. none of the above