A. analysis of a man-work method by using a motion picture camera with a timing device in the field of view
B. motion study* observed on enhanced time intervals
C. motion study of a sequence of operations conducted systematically
D. study of man and machine conducted simultaneously
E. scientific, analytically procedure for determining optimum work method
Production Technology
Production Technology
A. time motion unit
B. time measurement unit
C. time movement unit
D. technique measurement unit
E. time method unit
A. detailed calculations
B. convenience
C. table of random numbers
D. past experience
E. fixed percentage of daily production
A. second
B. minute
C. hour
D. day
E. none of the above
A. material handling
B. proper utilisation of manpower
C. production schedule
D. efficient working of machine
E. all of the above
A. batch production
B. continuous type of product
C. effective utilisation of machines
D. all of the above
E. none of the above
A. an idea of the flow of materials at various stages
B. a compact estimate of the handling which must be done between various work sections
C. the information for changes required in rearranging material handling equipment
D. an approximate estimate of the handling which must be done at a particular station
E. solution to handling techniques to achieve most optimum^ results
A. overall simplification, safety of integration
B. economy in space
C. maximum travel time in plant
D. to provide conveniently located shops
E. to avoid any bottlenecks
A. product layout
B. functional layout
C. automatic material handling equipment
D. specialisation of operation
E. minimum travel time plan and com¬pact layout
A. top level executives have to do excessive work
B. structure is rigid
C. communication delays occur
D. all of the above
E. none of the above