A. time motion unit
B. time measurement unit
C. time movement unit
D. technique measurement unit
E. time method unit
Related Mcqs:
- One time measurement unit (TMU) in method time measurement system equals______________?
A. 0.0001 minute
B. 0.0006 minute
C. 0.006 minute
D. 0.001 minute
E. 0.06 minute - The simplex method is the basic method for__________________?
A. value analysis
B. operation research
C. linear programming
D. model analysis
E. none of the above - Graphical method, simplex method, and transportation method are concerned with__________________?
A. break-even analysis
B. value analysis
C. linear programming
D. queing theory
E. tnaterial handling - Break-even analysis can be used for__________________?
A. short run analysis
B. long run analysis
C. average of above two run analysis
D. there is no such criterion
E. none of the above - PERT stands for k (fit) project evaluation and review technique__________________?
A. project examination and review technique
B. project evaluation and reporting technique
C. process execution and reporting technology
D. project execution and results technique - Job evaluation is the method-of determining the________________?
A. relative worth of jobs
B. skills required by a worker
C. contribution of a worker
D. contribution of a job
E. effectiveness of various alternatives - Merit Rating is the method of determining worth of_______________?
A. a job
B. an individual employee
C. a particular division in workshop
D. machine
E. overall quality - The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store_______________?
A. inflated system
B. primary cost method
C. current value method
D. fixed price method
E. variable price method - The first method invented for planning projects was________________?
A. bar chart method
B. milestone chart
C. critical path method (CPM)
D. programme evaluation and review technique (PERT)
E. none of the above - Which of the following is independent of sales forecast______________?
A. productivity
B. inventory control
C. production planning
D. production control
E. capital budgeting