A. Rowan Plan
B. Bedaux Plan
C. Taylor Differential Piece rate system
D. Halsey Premium plan
E. Day work plan
Production Technology
Production Technology
A. improving present method and finding standard time
B. motivation of workers
C. improving production capability
D. improving production planning and control
E. all of the above
A. operation
B. inspection
C. transport
D. delay/temporary storage
E. none of the above
A. operation
B. inspection
C. delay/ temporary Storage
D. permanent storage
E. none of the above
A. team of workers is working at a place
B. material handling is to be done
C. idle time is to be reduced
D. all of the above
E. none of the above
A. enlarged view of motion study
B. analysis of one stage of motion study
C. minute and detailed motion study
D. subdivision of an operation into therbligs and their analysis
E. motion study of small components upto mirco-seconds
A. policy allowance
B. interference allowance
C. process allowance
D. learning allowance
E. unforeseen allowance
A. total work content
B. base time + relaxation time
C. total work content + basic time
D. total work content + delay contingency allowance
E. total work content + relaxation time
A. when work should start and how much work should be completed during a certain period
B. when work should complete
C. that how idle time can be minimized
D. proper utilisation of machines
E. none of the above
A. determine overhead expenses
B. provide a basis for setting piece prices or incentive wages
C. determine standard costs
D. determine the capability of an operator to handle the number of machines
E. compare alternative methods