A. when work should start and how much work should be completed during a certain period
B. when work should complete
C. that how idle time can be minimized
D. proper utilisation of machines
E. none of the above
Related Mcqs:
- Pick up the correct step used for scheduling a project by C.P.M.__________________?
A. a project is divided into various activities
B. required time for each activity is established
C. sequence of various activities is made according to their importance
D. network is drawn by connecting the activities and the events
E. all of the above - Basic motion time study gives times for basic motions in ten thousandths of_______________?
A. second
B. minute
C. hour
D. day
E. none of the above - Gnatt charts provide information about_____________?
A. break even point analysis
B. production schedule
C. material handling layout
D. determining selling price
E. value analysis - Gnatt chart provides information about the________________?
A. material handling
B. proper utilisation of manpower
C. production schedule
D. efficient working of machine
E. all of the above - In micromotion study, therblig is described by_______________?
A. a symbol
B. an event
C. an activity
D. micro motions
E. standard symbol and colour - The grouping of activities into organisational units is called_________________?
A. corporate plans
B. higher level management
C. functional authority
D. departmentatidn
E. company policy - Routing is essential in the following type of industry_________________?
A. assembly industry
B. process industry
C. job order industry
D. mass production industry
E. steel industry - Work sampling observations are taken on the basis of_______________?
A. detailed calculations
B. convenience
C. table of random numbers
D. past experience
E. fixed percentage of daily production - The performance of a specific task in CPM is known as ______________________?
A. dummy
B. event
C. activity
D. contract
E. none of the above - The critical activity has____________________?
A. maximum float
B. minimum float
C. zero float,
D. average float
E. none of these