A. corporate plans
B. higher level management
C. functional authority
D. departmentatidn
E. company policy
Related Mcqs:
- The time by which the activity completion time can be delayed without affecting the start of succeeding activities, is Known as_________________?
A. duration
B. total float
C. free float
D. interfering float
E. none of the above - Critical path moves along the activities having total float of_____________________?
A. positive value
B. negative value
C. zero value
D. same value
E. none of the above - Expediting function consists in keeping a watch on__________________?
A. operator’s activity
B. flow of material and in case of trouble locate source of trouble
C. minimising the delays
D. making efficient despatching
E. none of the above - Templates are used for_________________?
A. a planning layout
B. flow of material
C. advancing a programme in automatic machines
D. copying complicated profiles
E. none of the above - Current assets include_______________?
A. manufacturing plant
B. manufacturing plant and equipment
C. inventories
D. common stock held by the firm
E. all of the above - In the Halsey 50-50 plan, the following are rewarded more___________________?
A. past good workers
B. past poor workers
C. past average workers
D. all of the above
E. none of the above - Gnatt charts are used for_________________?
A. forecasting sales
B. production schedule
C. scheduling and routing
D. linear programming
E. none of the above - Slack represents the difference between the___________________?
A. latest allowable time and the normal expected time
B. latest allowable time and the earliest expected time
C. proposed allowable time and the earliest expected time
D. normal allowable time and the latest expected time
E. project initiation tune and actual starting time - An event is indicated on the network by_________________?
A. a straight line
B. a number enclosed in a circle or a square
C. a straight line with circles at the ends
D. a dotted line
E. an arrow - CPM is the___________________?
A. time oriented technique
B. event oriented technique
C. activity oriented technique
D. target oriented technique
E. work oriented technique