A. break even point analysis
B. production schedule
C. material handling layout
D. determining selling price
E. value analysis
Related Mcqs:
- Gnatt charts are used for_________________?
A. forecasting sales
B. production schedule
C. scheduling and routing
D. linear programming
E. none of the above - Gnatt chart provides information about the________________?
A. material handling
B. proper utilisation of manpower
C. production schedule
D. efficient working of machine
E. all of the above - Travel charts provide__________________?
A. an idea of the flow of materials at various stages
B. a compact estimate of the handling which must be done between various work sections
C. the information for changes required in rearranging material handling equipment
D. an approximate estimate of the handling which must be done at a particular station
E. solution to handling techniques to achieve most optimum^ results - A big advantage of PERT over Gantt charts is that in the former case_________________?
A. activities and events are clearly shown
B. early start and late finish of an activity are clearly marked
C. activity times are clear
D. critical path can be easily determined
E. inter-relationship among activities is clearly shown - Bar charts are suitable for_____________________?
A. minor works
B. major works
C. large projects
D. all of the above
E. none of the above - In order that linear programming techniques provide valid results________________?
A. relations between factors must be linear (positive)
B. relations between factors must be linear (negative)
C. A. or B.
D. only one factor should change at a time, others remaining constant
E. none of the above - Scheduling gives information about____________________?
A. when work should start and how much work should be completed during a certain period
B. when work should complete
C. that how idle time can be minimized
D. proper utilisation of machines
E. none of the above - Per cent idle time for men or machines is found by___________________?
A. work sampling
B. time study
C. method study
D. work study
E. ABC analysis - Job enrichment technique is applied to_________________?
A. reduce labour monotony
B. overcome boring and demotivating work
C. make people happy
D. all of the above
E. none of the above - Which of the following organisation is preferred in automobile industry________________?
A. functional organisation
B. line organisation
C. staff organisation
D. line and staff organisations
E. scalar organisation