A. work sampling
B. time study
C. method study
D. work study
E. ABC analysis
Related Mcqs:
- Work study is done with the help of_______________?
A. process chart
B. material handling
C. stop watch
D. all of the above
E. none of the above - Inventory management consists of__________________?
A. effective running of stores
B. state of merchandise methods of stroing and maintenance etc
C. stock control system
D. all of the above
E. none of the above - Father of time study was_________________?
A. F.W. Taylor
B. H.L. Gantt
C. F.B. Gilberfh
D. R.M. Barnes
E. H.B. Maynord - Tick the odd man out_______________?
A. Taylor
B. Drucker
C. McGregor
D. Galileo
E. Parkinson - Gnatt charts provide information about_____________?
A. break even point analysis
B. production schedule
C. material handling layout
D. determining selling price
E. value analysis - Choose the wrong statement Time study is used to_________________?
A. determine overhead expenses
B. provide a basis for setting piece prices or incentive wages
C. determine standard costs
D. determine the capability of an operator to handle the number of machines
E. compare alternative methods - String diagram is used_________________?
A. for checking the relative values of various layouts
B. when a group of workers are working at a place
C. where processes require the operator to be moved from one place to another
D. all of the above
E. none of the above - If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good______________________?
A. EF=ES+D
B. LS=LF-D
C. LF = LS + D
D. D = EF-ES
E. all of the above - Activity s,lack or float of any event on a PERT/CPM chart is represented by__________________?
A. latest start time of succeeding event -earliest finish time of preceding event activity time
B. latest start time of the event – earliest start time of the event
C. latest finish time of event – earliest finish time of the event
D. anyone of the above
E. none of the above - The difference between the time available to do the job and the time required to do the job, is known as_________________?
A. event
B. float
C. duration
D. constraint
E. none of the above