A. effective running of stores
B. state of merchandise methods of stroing and maintenance etc
C. stock control system
D. all of the above
E. none of the above
Related Mcqs:
- Inventory control in production, planning and control aims at________________?
A. achieving optimisation
B. ensuring against market fluctuations
C. acceptable customer service at low capital investment in inventory
D. discounts allowed in bulk purchase
E. regulate supply and demand - In the perpetual inventory control, the material is checked when it reaches its________________?
A. minimum value
B. maximum value
C. average value
D. alarming value
E. original value - In inventory control, the economic order quantity is the_________________?
A. optimum lot size
B. highest level of inventory
C. lot corresponding to break-even point
D. capability of a plant to produce
E. none of the above - In perpetual inventory control, the material is checked as it reaches its__________________?
A. minimum value
B. maximum value
C. average value
D. middle value
E. alarming value - Expediting function consists in keeping a watch on__________________?
A. operator’s activity
B. flow of material and in case of trouble locate source of trouble
C. minimising the delays
D. making efficient despatching
E. none of the above - Routing prescribes the_________________?
A. flow of material in the plant
B. proper utilization of man power
C. proper utilization of machines
D. inspection of final product
E. none of the above - Graphical method, simplex method, and transportation method are concerned with__________________?
A. break-even analysis
B. value analysis
C. linear programming
D. queing theory
E. tnaterial handling - Basic motion time study gives times for basic motions in ten thousandths of_______________?
A. second
B. minute
C. hour
D. day
E. none of the above - The time of completing a project in network analysis is given by following time of the critical activity meeting at the finalitiode_________________?
A. early finish
B. early start
C. late start
D. late finish
E. none of the above - Critical path moves along the activities having total float of_____________________?
A. positive value
B. negative value
C. zero value
D. same value
E. none of the above