A. effective running of stores
B. state of merchandise methods of stroing and maintenance etc
C. stock control system
D. all of the above
E. none of the above
Advertisement
Related Mcqs:
- Inventory control in production, planning and control aims at________________?
- A. achieving optimisation B. ensuring against market fluctuations C. acceptable customer service at low capital investment in inventory D. discounts allowed in bulk purchase E. regulate supply and demand...
- In the perpetual inventory control, the material is checked when it reaches its________________?
- A. minimum value B. maximum value C. average value D. alarming value E. original value...
- In inventory control, the economic order quantity is the_________________?
- A. optimum lot size B. highest level of inventory C. lot corresponding to break-even point D. capability of a plant to produce E. none of the above...
- In perpetual inventory control, the material is checked as it reaches its__________________?
- A. minimum value B. maximum value C. average value D. middle value E. alarming value...
- Expediting function consists in keeping a watch on__________________?
- A. operator’s activity B. flow of material and in case of trouble locate source of trouble C. minimising the delays D. making efficient despatching E. none of the above...
- Routing prescribes the_________________?
- A. flow of material in the plant B. proper utilization of man power C. proper utilization of machines D. inspection of final product E. none of the above...
- Graphical method, simplex method, and transportation method are concerned with__________________?
- A. break-even analysis B. value analysis C. linear programming D. queing theory E. tnaterial handling...
- Basic motion time study gives times for basic motions in ten thousandths of_______________?
- A. second B. minute C. hour D. day E. none of the above...
- The time of completing a project in network analysis is given by following time of the critical activity meeting at the finalitiode_________________?
- A. early finish B. early start C. late start D. late finish E. none of the above...
- Critical path moves along the activities having total float of_____________________?
- A. positive value B. negative value C. zero value D. same value E. none of the above...
Advertisement