A. a project is divided into various activities
B. required time for each activity is established
C. sequence of various activities is made according to their importance
D. network is drawn by connecting the activities and the events
E. all of the above
Related Mcqs:
- Scheduling gives information about____________________?
A. when work should start and how much work should be completed during a certain period
B. when work should complete
C. that how idle time can be minimized
D. proper utilisation of machines
E. none of the above - Pick up the correct statement from the following?
A. critical path method is an improvement upon bar chart method
B. critical path method provides a realistic approach to the daily problems
C. critical path method avoids delays which are very common in bar chart
D. critical path method was invented by Morgan R. Walker of Dupot and James E. Kelley of Remington U.S.A in 1957
E. all of the above - Pick up the correct statement from the following?
A. the float may be positive, zero or negative
B. if the float is positive and the activity is delayed by a period equal to its total float, the completion of project in not delayed
C. if the float of an activity is negative, delay in its performance is bound to delay the completion of project
D. if the float of an activity is zero, the activity is critical and any delay in its performance will delay the whole project
E. all of the above - Pick up the correct statement about relationship between various floats______________________?
A. free float = total float
B. independent float = total float
C. independent float > free float
D. free float > total float
E. independent float < free float - Pick up the correct statement from the following?
A. programmer evaluation and review technique is event oriented
B. programmer evaluation and review technique is not event oriented
C. critical path method is event oriented
D. critical.path method is not activity oriented
E. none of the above - Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it_________________?
A. consumes time, but no resources
B. consumes resources but no time
C. consumes neither time nor resources
D. is a dangling event
E. consumes both resources and time - Pick up the correct statement as regards Cornish boiler and Lancashire boiler _______________?
A. cornish is fire tube and lancashire is water tube
B. cornish is water tube and lancashire is fire tube
C. cornish has two fire tubes and lancashire has one
D. lancashire has two fire tubes and cornish has one
E. both have two fire tubes - Pick up the wrong statement about supercharging __________________?
A. supercharging reduces knocking in diesel engines
B. there can be limited supercharging in petrol engines because of detonation
C. supercharging at high altitudes is essential
D. supercharging results in fuel economy
E. supercharging is essential in aircraft engines - Which of the following is not the correct method of increasing fatigue limit __________________?
A. shot peening
B. nitriding of surface
C. cold working
D. surface decarburisation
E. under-stressing - PERT stands for k (fit) project evaluation and review technique__________________?
A. project examination and review technique
B. project evaluation and reporting technique
C. process execution and reporting technology
D. project execution and results technique