A. free float = total float
B. independent float = total float
C. independent float > free float
D. free float > total float
E. independent float < free float
Related Mcqs:
- Pick up the correct statement from the following?
A. critical path method is an improvement upon bar chart method
B. critical path method provides a realistic approach to the daily problems
C. critical path method avoids delays which are very common in bar chart
D. critical path method was invented by Morgan R. Walker of Dupot and James E. Kelley of Remington U.S.A in 1957
E. all of the above - Pick up the correct statement from the following?
A. the float may be positive, zero or negative
B. if the float is positive and the activity is delayed by a period equal to its total float, the completion of project in not delayed
C. if the float of an activity is negative, delay in its performance is bound to delay the completion of project
D. if the float of an activity is zero, the activity is critical and any delay in its performance will delay the whole project
E. all of the above - Pick up the correct statement from the following?
A. programmer evaluation and review technique is event oriented
B. programmer evaluation and review technique is not event oriented
C. critical path method is event oriented
D. critical.path method is not activity oriented
E. none of the above - Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it_________________?
A. consumes time, but no resources
B. consumes resources but no time
C. consumes neither time nor resources
D. is a dangling event
E. consumes both resources and time - Pick up the correct statement as regards Cornish boiler and Lancashire boiler _______________?
A. cornish is fire tube and lancashire is water tube
B. cornish is water tube and lancashire is fire tube
C. cornish has two fire tubes and lancashire has one
D. lancashire has two fire tubes and cornish has one
E. both have two fire tubes - Pick up the correct step used for scheduling a project by C.P.M.__________________?
A. a project is divided into various activities
B. required time for each activity is established
C. sequence of various activities is made according to their importance
D. network is drawn by connecting the activities and the events
E. all of the above - Choose the correct relationship ?
A. specific gravity = gravity x density
B. dynamicviscosity = kinematicviscosity x density
C. gravity = specific gravity x density
D. kinematicviscosity = dynamicviscosity x density
E. hydrostaticforce = surface tension x gravity - Pick up the incorrect statement from the following?
A. an activity of the project is denoted by an arrow on the net work
B. the tail of the arrow indicates the start of the activity
C. the head of the arrow indicates the end of,the activity!
D. the arrows are drawn (to scale from) left to right
E. each activity consumes a given time - Pick up the false statement ?
A. Thermal efficiency of diesel engine i about 34%
B. Theoretically correct mixture of air am petrol is approximately 15 : 1
C. High speed compression engines operate on dual combustion cycle
D. Diesel engines are compression ignition engines
E. S.I. engines are quality-governed engines - Pick up false statement?
A. For petrol and large gas engines, quantity governingds preferred
B. In quantity governing, air fuel ratio is almost constant and quantity of charge is changed depending on load
C. In hit and miss governing, fuel supply is completely cut off during one or more number of cycles
D. In quality governing, quantity of fuel is varied to suit the load and total charge of air is varied
E. For close regulation of speed, combination of both quality and quantity governing is used