A. team of workers is working at a place
B. material handling is to be done
C. idle time is to be reduced
D. all of the above
E. none of the above
Related Mcqs:
- String diagram is used_________________?
A. for checking the relative values of various layouts
B. when a group of workers are working at a place
C. where processes require the operator to be moved from one place to another
D. all of the above
E. none of the above - Per cent idle time for men or machines is found by___________________?
A. work sampling
B. time study
C. method study
D. work study
E. ABC analysis - Standard time is defined as ____________________?
A. normal time + allowances
B. normal time + idle time + allowances
C. normal time + idle time
D. only normal time for an operation
E. none of the above - Job enrichment technique is applied to_________________?
A. reduce labour monotony
B. overcome boring and demotivating work
C. make people happy
D. all of the above
E. none of the above - Graphical method, simplex method, and transportation method are concerned with__________________?
A. break-even analysis
B. value analysis
C. linear programming
D. queing theory
E. tnaterial handling - The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store_______________?
A. inflated system
B. primary cost method
C. current value method
D. fixed price method
E. variable price method - Basic motion time study gives times for basic motions in ten thousandths of_______________?
A. second
B. minute
C. hour
D. day
E. none of the above - The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as_________________?
A. Rowan Plan
B. Bedaux Plan
C. Taylor Differential Piece rate system
D. Halsey Premium plan
E. Day work plan - In PERT analysis, critical path is obtained by joining events having___________________?
A. +ve slack
B. -ve slack
C. zero sldck
D. dummy activities
E. critical activities - Bin card is used in__________________?
A. administrative wing
B. workshop
C. foundry shop
D. stores
E. assembly shop