A. L + 0.42 d
B. L + (2 × 0.42 d)
C. L – (0.42 d)
D. L – (2 × 0.4 d)
0
The measurement is made for stone work in square metre in case of________________?
0
The expected out turn of 12 mm plastering with cement mortar is_______________?
A. Wall facing
B. Columns, lintels, copings
C. Building work
D. A. and D. of the above
0
Carpet area does not include the area of_________________?
A. 2.5 sq m
B. 4.0 sq m
C. 6.0 sq m
D. 8.0 sq m
0
In case of laying gullies, siphons, intercepting traps, the cost includes_______________?
A. The walls along with doors and other openings
B. Bath room and lavatory
C. Kitchen and pantry
D. All the above
0
The inspection pit or chamber is a manhole provided in a base drainage system________________?
A. Setting and laying
B. Bed concreting
C. Connection to drains
D. All of these
0
The ‘centre line method’ is specially adopted for estimating_________________?
A. At every change of direction
B. At every change of gradient
C. At every 30 m intervals
D. All the above
0
The unit of measurement is per quintal for the following?
A. Circular buildings
B. Hexagonal buildings
C. Octagonal buildings
D. All the above
0
The order of booking dimensions is________________?
A. Collapsible gates with rails
B. Rolling shutters
C. Expanded metal wire netting
D. M.S. reinforcement of R.C.C. works
0
The correct Prismoidal formula for volume is________________?
A. Length, breadth, height
B. Breadth, length, height
C. Height, breadth, length
D. None of these
Download App