A. 2.0 %
B. 2.5 %
C. 4.0 %
D. 5.0 %
0
The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
0
While preparing a detailed estimate__________________?
A. 2.5 sqm
B. 5.0 sqm
C. 7.5 sqm
D. 10 sqm
0
The most reliable estimate is_________________?
A. Dimension should be measured correct to 0.01 m
B. Area should be measured correct to 0.01 sqm
C. Volume should be measured correct to 0.01 cum
D. All the above
0
According to ISI method of measurement, the order of the sequence is_________________?
A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate
0
The item of the brick structure measured in sq.m, is___________________?
A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. None of these
0
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
A. Reinforced brick work
B. Broken glass coping
C. Brick edging
D. Brick work in arches
0
Anti-siphonage pipe is connected to__________________?
A. (6 + 15) chains
B. (6 + 12) chains
C. (6 + 18) chains
D. None of these
0
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved ?
A. Main soil pipe
B. Bottom of P trap W.C.
C. Top of P trap W.C.
D. Side of water closet
0
The concrete work for the following part of the building of specified thickness is measured in square metres_______________?
A. 26,000 m3
B. 26,500 m3
C. 27,000 m3
D. 27,500 m3