A. 100 mm
B. 150 mm
C. 200 mm
D. 175 mm
Related Mcqs:
- If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_______________?
A. Mid-section formula
B. Trapezoidal formula
C. Prismoidal formula
D. All the above - The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
A. (6 + 15) chains
B. (6 + 12) chains
C. (6 + 18) chains
D. None of these - A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved ?
A. 26,000 m3
B. 26,500 m3
C. 27,000 m3
D. 27,500 m3 - The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________?
A. 3250 m3
B. 3225 m3
C. 3275 m3
D. 3300 m3 - The trap which is provided to disconnect the house drain from the street sewer is called_________________?
A. Master trap
B. Intercepting trap
C. Interception manhole
D. All the above - As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?
A. 1.80 litres for 5 to 10 users
B. 1.20 litres for 15 users
C. 1.35 for 20 users
D. All the above - Anti-siphonage pipe is connected to__________________?
A. Main soil pipe
B. Bottom of P trap W.C.
C. Top of P trap W.C.
D. Side of water closet - The rate of payment is made for 100 cu m (per % cu m) in case of__________________?
A. Earth work in excavation
B. Rock cutting
C. Excavation in trenches for foundation
D. All the above - For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
A. 0.90 m3
B. 0.94 m3
C. 0.98 m3
D. 1.00 m3 - For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
A. 0.200 m3
B. 0.247 m3
C. 0.274 m3
D. 0.295 m3