A. Circular buildings
B. Hexagonal buildings
C. Octagonal buildings
D. All the above
Related Mcqs:
- A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved ?
A. 26,000 m3
B. 26,500 m3
C. 27,000 m3
D. 27,500 m3 - In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?
A. Breadth of the wall
B. Half breadth of wall on each side
C. One fourth breadth of wall on each side
D. None of these - Pick up the correct statement regarding the centre line method of estimating a building?
A. Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item
B. The centre line is worked out separately for different sections of walls of a building
C. The centre line length is reduced by half the layer of main wall joining the partition wall
D. All the above - According to ISI method of measurement, the order of the sequence is_________________?
A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. None of these - Referring of given figure, pick up the correct statement from the following?
A. The total length of centre line of four walls is 20 m
B. Length of long wall out-to -out is 6.80 m
C. Length of short walls in-to-in is 3.20 m
D. All the above - The measurement is made in square metre in case of_________________?
A. Cement concrete in foundation
B. R.C.C. structure
C. Hollow concrete block wall
D. None of these - Pick up the correct statement from the following ?
A. Pointing is measured in sq.m
B. Plastering is measured in sq.m
C. Glazing is measured in sq.m
D. All the above - The most reliable estimate is_________________?
A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate - Pick up the correct statement from the following?
A. The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies
B. Additional supervising staff engaged at work site, is called work charged establishment
C. Detailed specifications specify qualities, quantities and the proportions of materials to be used for a particular item
D. All the above - The item of steel work which is measured in sq.m, is_________________?
A. Collapsible gates
B. Rolling shutters
C. Ventilators and glazing
D. All the above