A. Collapsible gates with rails
B. Rolling shutters
C. Expanded metal wire netting
D. M.S. reinforcement of R.C.C. works
Related Mcqs:
- As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?
A. 1.80 litres for 5 to 10 users
B. 1.20 litres for 15 users
C. 1.35 for 20 users
D. All the above - The measurement is made in square metre in case of_________________?
A. Cement concrete in foundation
B. R.C.C. structure
C. Hollow concrete block wall
D. None of these - The measurement is not made in square metres in case of________________?
A. D.P.C. (Damp proof course)
B. Form works
C. Concrete Jeffries
D. R.C. Chhajja - According to ISI method of measurement, the order of the sequence is_________________?
A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. None of these - The measurement is made for stone work in square metre in case of________________?
A. Wall facing
B. Columns, lintels, copings
C. Building work
D. A. and D. of the above - The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________?
A. 1.5 m 3
B. 2.5 m3
C. 3.5 m3
D. 5.0 m3 - The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
A. 2.5 sqm
B. 5.0 sqm
C. 7.5 sqm
D. 10 sqm - The expected out turn for earth work in excavation in ordinary soil per workman per day is_______________?
A. 1.00 cum
B. 2.00 cum
C. 3.00 cum
D. 4.00 cum - The expected out turn of half brick partition wall per mason per day is___________________?
A. 1.5 m 3
B. 2.0 m3
C. 4.0 m2
D. 5.0 m2 - The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________?
A. 1.00 m3
B. 1.25 m3
C. 1.50 m3
D. 1.75 m3