A. Setting and laying
B. Bed concreting
C. Connection to drains
D. All of these
Related Mcqs:
- The brick work is not measured in cu m in case of_______________?
A. One or more than one brick wall
B. Brick work in arches
C. Reinforced brick work
D. Half brick wall - The rate of payment is made for 100 cu m (per % cu m) in case of__________________?
A. Earth work in excavation
B. Rock cutting
C. Excavation in trenches for foundation
D. All the above - The measurement is made in square metre in case of_________________?
A. Cement concrete in foundation
B. R.C.C. structure
C. Hollow concrete block wall
D. None of these - The measurement is not made in square metres in case of________________?
A. D.P.C. (Damp proof course)
B. Form works
C. Concrete Jeffries
D. R.C. Chhajja - The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length L, is_________________?
A. L + 0.42 d
B. L + (2 × 0.42 d)
C. L – (0.42 d)
D. L – (2 × 0.4 d) - The measurement is made for stone work in square metre in case of________________?
A. Wall facing
B. Columns, lintels, copings
C. Building work
D. A. and D. of the above - Pick up the correct statement in case of water supply ?
A. Pipes laid in trenches and pipes fixed to walls are measured separately
B. Cutting through walls and floors are included with the item
C. Pipes are classified according to their sizes and quality
D. All the above - The brick work is measured in sq metre, in case of_________________?
A. Honey comb brick work
B. Brick flat soling
C. Half brick walls or the partition
D. All the above - Cost of fittings and their fixing is specified for the following sanitary fittings________________?
A. Water closets
B. Flushing pipes
C. Lavatory basins
D. All the above - The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500