A. 90
B. 72
C. 36
D. 108
Related Mcqs:
- 15 cattle can graze a field in 20 days 20 cattle can graze 3 such field in how many days?
A. 30
B. 45
C. 60
D. 50 - If 10 bulls can plough 20 identical fields in 3 days working 10 hours a day, then in how many days can 30 bulls plough 32 same identical fields working 8 hours a day?
A. 2
B. 8
C. 10
D. 12 - P and Q can do a work in 30 days. Q and R can do the same work in 24 days and R and P in 20 days. They started the work together, but Q and R left after 10 days. How many days more will P take to finish the work?
A. 10
B. 8
C. 18
D. 19 - The perimeter of circle field and a square field are equal. If the area of these square field is 12100m2, the area of a circular field will be_________?
A. 15500Sq.m
B. 15400Sq.m
C. 15200Sq.m
D. 15300Sq.m - An agricultural field is in the form of a rectangle of length 20m and width 14m. A pit 6m long 3m wide and 2.5m deep is dug in a corner of the field and earth taken out of the pit is spread uniformly over. The remaining area of the field. The level of the field has raised by________?
A. 15.16cm
B. 16.17cm
C. 17.18cm
D. 18.19m - The length of the rectangular field is double its width. Inside the field there is square shaped pond 8m long. If the area of the pond is 1/8 of the area of the field. What is the length of the field?
A. 31 m
B. 32 m
C. 16 m
D. 20 m - P and Q need 8 days to complete a work. Q and R need 12 days to complete the same work. But P, Q and R together can finish it in 6 days. How many days will be needed if P and R together do it?
A. 7
B. 8
C. 9
D. 10 - P can do a work in 24 days. Q can do the same work in 9 days and R can do the same in 12 days. Q and R start the work and leave after 3 days. P finishes the remaining work in_________days.
A. 10
B. 9
C. 11
D. 12 - P can lay railway track between two stations in 16 days. Q can do the same job in 12 days. With the help of R, they completes the job in 4 days. How much days does it take for R alone to complete the work?
A. 9(3/5) days
B. 9(1/5) days
C. 9(2/5) days
D. 10 days - A and B can finish a work 30 days if they work together. They worked together for 20 days and then B left. A finished the remaining work in another 20 days. In how many days A alone can finish the work?
A. 70
B. 50
C. 40
D. 60