A. 30
B. 45
C. 60
D. 50
Advertisement
Related Mcqs:
- 18 cattle graze a field in 12 days. 6 cattle can graze 3 of such fields in x days. What is x?
- A. 90 B. 72 C. 36 D. 108...
- P and Q can do a work in 30 days. Q and R can do the same work in 24 days and R and P in 20 days. They started the work together, but Q and R left after 10 days. How many days more will P take to finish the work?
- A. 10 B. 8 C. 18 D. 19...
- The perimeter of circle field and a square field are equal. If the area of these square field is 12100m2, the area of a circular field will be_________?
- A. 15500Sq.m B. 15400Sq.m C. 15200Sq.m D. 15300Sq.m...
- An agricultural field is in the form of a rectangle of length 20m and width 14m. A pit 6m long 3m wide and 2.5m deep is dug in a corner of the field and earth taken out of the pit is spread uniformly over. The remaining area of the field. The level of the field has raised by________?
- A. 15.16cm B. 16.17cm C. 17.18cm D. 18.19m...
- The length of the rectangular field is double its width. Inside the field there is square shaped pond 8m long. If the area of the pond is 1/8 of the area of the field. What is the length of the field?
- A. 31 m B. 32 m C. 16 m D. 20 m...
- A and B can finish a piece of work in 20 days .B and C in 30 days and C and A in 40 days. In how many days will A alone finish the job?
- A. 48 B. 34(2/7) C. 44 D. 45...
- P can do a work in 24 days. Q can do the same work in 9 days and R can do the same in 12 days. Q and R start the work and leave after 3 days. P finishes the remaining work in_________days.
- A. 10 B. 9 C. 11 D. 12...
- Farjan and Kashif can complete a task in 30 days. Farjan leaves after 20 days and Kashif alone completes it in another 25 days. How many days does Farjan alone take to complete the entire task?
- A. 50 B. 75 C. 60 D. 45...
- C takes 6 days to complete half of a work and D takes 5 days to complete 1/3rd of the same work. They take turns to complete the task. If C works for the first 4 days, in how many days will D complete the rest of the work without the help of C?
- A. 10 days B. 12 days C. 8 days D. 9 days...
- A and B can finish a work 30 days if they work together. They worked together for 20 days and then B left. A finished the remaining work in another 20 days. In how many days A alone can finish the work?
- A. 70 B. 50 C. 40 D. 60...
Advertisement