A. 30
B. 45
C. 60
D. 50
Related Mcqs:
- 18 cattle graze a field in 12 days. 6 cattle can graze 3 of such fields in x days. What is x?
A. 90
B. 72
C. 36
D. 108 - P and Q can do a work in 30 days. Q and R can do the same work in 24 days and R and P in 20 days. They started the work together, but Q and R left after 10 days. How many days more will P take to finish the work?
A. 10
B. 8
C. 18
D. 19 - The perimeter of circle field and a square field are equal. If the area of these square field is 12100m2, the area of a circular field will be_________?
A. 15500Sq.m
B. 15400Sq.m
C. 15200Sq.m
D. 15300Sq.m - An agricultural field is in the form of a rectangle of length 20m and width 14m. A pit 6m long 3m wide and 2.5m deep is dug in a corner of the field and earth taken out of the pit is spread uniformly over. The remaining area of the field. The level of the field has raised by________?
A. 15.16cm
B. 16.17cm
C. 17.18cm
D. 18.19m - The length of the rectangular field is double its width. Inside the field there is square shaped pond 8m long. If the area of the pond is 1/8 of the area of the field. What is the length of the field?
A. 31 m
B. 32 m
C. 16 m
D. 20 m - A and B can finish a piece of work in 20 days .B and C in 30 days and C and A in 40 days. In how many days will A alone finish the job?
A. 48
B. 34(2/7)
C. 44
D. 45 - P can do a work in 24 days. Q can do the same work in 9 days and R can do the same in 12 days. Q and R start the work and leave after 3 days. P finishes the remaining work in_________days.
A. 10
B. 9
C. 11
D. 12 - Farjan and Kashif can complete a task in 30 days. Farjan leaves after 20 days and Kashif alone completes it in another 25 days. How many days does Farjan alone take to complete the entire task?
A. 50
B. 75
C. 60
D. 45 - C takes 6 days to complete half of a work and D takes 5 days to complete 1/3rd of the same work. They take turns to complete the task. If C works for the first 4 days, in how many days will D complete the rest of the work without the help of C?
A. 10 days
B. 12 days
C. 8 days
D. 9 days - A and B can finish a work 30 days if they work together. They worked together for 20 days and then B left. A finished the remaining work in another 20 days. In how many days A alone can finish the work?
A. 70
B. 50
C. 40
D. 60