A. shows the inter dependences of various jobs
B. depicts the delay of jobs, if any
C. points outgoing ahead of schedule of jobs, if any
D. all of the above
E. none of the above
Related Mcqs:
- The main advantage of line organisation is its_______________?
A. effective command and control
B. defined responsibilities at all levels
C. rigid discipline in the organisation
D. ability of quick decision at all levels
E. all of the above - The term ‘value’ in value engineering refers to_______________?
A. total cost of the product
B. selling price of the product
C. utility of the product
D. manufactured cost of the product
E. depreciation value - In Lincoln plan (one type of group incentive plan), the amount of the profit which an .employee receives in addition to the guaranteed basic _________________?
pay/wages, is based on :
A. a standard rating system
B. a merit rating system
C. a job evaluation system
D. his individual performance
E. all of the above - Motion study involves analysis of________________?
A. actions of operator
B. layout of work place
C. tooling and equipment
D. all of the above
E. none of the above - The most important objective behind plant layout is_____________________?
A. overall simplification, safety of integration
B. economy in space
C. maximum travel time in plant
D. to provide conveniently located shops
E. to avoid any bottlenecks - String diagram is used when__________________?
A. team of workers is working at a place
B. material handling is to be done
C. idle time is to be reduced
D. all of the above
E. none of the above - Monte Carlo solutions in queuing theory are extremely useful in queuing problems_________________?
A. that can’t be analysed mathematically
B. involving multistage queuing
C. to verify mathematical results
D. all of the above
E. none of the above - The time which results in the least possible direct cost of an activity is known as________________?
A. normal time
B. slow time
C. crash time
D. standard time
E. none of the above - PERT is___________________?
A. an analytic tool in concept
B. limit up of event oriented diagrams
C. used for research and development projects
D. based on three time estimates for activities linking up two events
E. all of the above - Which of the following is not wage incentive plan_________________?
A. differential piece rate system
B. Rowan plan
C. Emerson plan
D. Taylor plan
E. Halsey plan