A. End-users
B. Client
C. Project (technical) managers
D. Senior managers
Explanation: A product is always built to satisfy an end-user.
Related Mcqs:
- Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - What involves preparing software for external release and keeping track of the system versions that have been released for customer use ?
A. System building
B. Release management
C. Change management
D. Version management - Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - A software ______________ provides the framework from which a comprehensive plan for software development can be established?
A. people
B. product
C. process
D. none of the mentioned - The project planner examines the statement of scope and extracts all important software functions which is known as___________________?
A. Association
B. Decomposition
C. Planning process
D. All of the mentioned - Which risks are associated with the overall size of the software to be built or modified ?
A. Business impact risks
B. Process definition risks
C. Product size risks
D. Development environment risks - If a Direct approach to software project sizing is taken, size can be measured in__________________?
A. LOC
B. FP
C. LOC and FP
D. None of the mentioned - Which is a software configuration management concept that helps us to control change without seriously impeding justifiable change ?
A. Baselines
B. Source code
C. Data model
D. None of the mentioned - What is used to determine the recommended degree of rigor with which the software process should be applied on a project ?
A. Degree of Rigor
B. Adaptation criteria
C. Task Set
D. Both degree of Rigor and adaptation criteria - Which of the following is a project scheduling method that can be applied to software development ?
A. PERT
B. CPM
C. CMM
D. Both PERT and CPM