A. 12 days
B. 14 days
C. 16 days
D. 18 days

3 men does same work as 4 women in 43 days.

multiply 3 and 4 and 43 for a supposed amount of total work (516).

Now calculate how much work is done by 3 men in one day by dividing 516 by 43 (12). Then calculate one man work in one day by dividing 12 by 3 (4).

Same (12) amount of work is done by 4 women in one day. so one women does 12/4 (3) in one day.

now see there are 7 men and 5 women in the final team.
total amount of work in one day will be

7(4)+5(3) = 43

Now divide total work (516) by total work in one day (43) to get the answer (12)



Basic Maths Mcqs
Basic Maths Mcqs for Preparation
Mathematics Mcqs
Mathematics Mcqs, Maths Mcqs for Preparation

Mathematics Mcqs - Maths Mcqs are very important for every test. prepare for NTS, FPSC, PPSC, SPSC, CSS, PMS Test Preparation. and all other testing services. Most of the test syllabus contain Mathematics test portion. Here you will find most important Mathematics Mcqs. here these Mcqs will help you getting good marks in this Section. Here you will find most important Mcqs of Mathematics from Basic to Advance. some of the most important sub categories are: Average, Percentage, Problem on Ages, Time and Distance, HCF and LCM, Logarithms, Discount, Interest, Ratio & Proportion, Decimal Fraction and other.

MATHEMATICS MCQS
1. Basic Maths Mcqs 17. Arithmetic Mcqs
2. Average Mcqs 18. Boats and Streams
3. Compound Interest 19. Areas
4. Height and Distance Mcqs 20. Discount Mcqs
5. Men Food Mcqs 21. interest Mcqs
6. Mixtures and Allegations 22. Mensuration
7. Partnership 23. Odd Man Out Series Mcqs
8. Pipes and Cisterns 24. Volumes
9. Permutations and Combinations 25. Probability
10. Problems on L.C.M and H.C.F 26. Problems on Numbers
11. Profit and Loss Mcqs 27. Quadratic Equations
12. Races and Games 28. Ratio and Proportion
13. Simple Equations 29. Simplification and Approximation
14. Stocks and Shares Mcqs 30. Time & Distance Mcqs
15. Time and Work Mcqs 31. Volume and Surface Area Mcqs
16. Percentage Mcqs 32. Math Solutions
Time and Work Mcqs
Time and Work Mcqs calculations for Mathematics Preparation with detailed explanation.

IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.

PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.

32 Comments to “If 3 men or 4 women can construct a wall in 43 days, then the number of days that 7 men and 5 women take to construct it is :”
  1. 3M*43 = total work ,which is equal to 4W*43 (Since efficiency *time =total work)

    so equating both eqn

    3M*43=4W*43
    so we get efficiency ratio M:W =4:3
    total work = 3*4*43 =516
    total work/efficency =time

    516/(7M+5W) =time

    substituting efficiency ratio in the above eqn
    516/(7*4 + 5*3) =12days

    hope this helps..

    1. CORRECT ANS IS 12
      3 men construct a wall in 43 days

      So 3 men’s work in a day = 1/43 part

      Hence 1 man’s work in day = 1/(43 x 3) part

      Similarly 1 woman’s work in a day = 1/(43 x 4) part

      7 men and 5 women’s work = 7 x 1/ 43 x 3 + 5 x 1/ 43 x 4 =( 7 x4 + 5 x 3)/43 x 3 x 4

      = ( 28 +15)/ (43 x 12 ) = 43/(43 x 12) = 1/ 12 part

      So 7 men and 5 women take 12 days to construct a wall .

    2. 3 men work in 43 days

      So 3 men’s work in a day = 1/43 part

      Hence 1 man’s work in day = 1/(43 x 3) part

      Similarly 1 woman’s work in a day = 1/(43 x 4) part

      7 men and 5 women’s work = 7 x 1/ 43 x 3 + 5 x 1/ 43 x 4 =( 7 x4 + 5 x 3)/43 x 3 x 4

      = ( 28 +15)/ (43 x 12 ) = 43/(43 x 12) = 1/ 12 part

      So 7 men and 5 women take 12 days to construct the wall.

    3. 3 men reap the field in 43 days

      So 3 men’s work in a day = 1/43 part

      Hence 1 man’s work in day = 1/(43 x 3) part

      Similarly 1 woman’s work in a day = 1/(43 x 4) part

      7 men and 5 women’s work = 7 x 1/ 43 x 3 + 5 x 1/ 43 x 4 =( 7 x4 + 5 x 3)/43 x 3 x 4

      = ( 28 +15)/ (43 x 12 ) = 43/(43 x 12) = 1/ 12 part

      So 7 men and 5 women take 12 days to reap the the field.

    4. 3 Men =43 days

      1 Man = 129 days

      1 Man in 1 day = 1/129 of the work

      4 women = 43 days

      1 woman = 172 days

      1 woman in 1 day = 1/172 of the work

      7 Men + 5 Women in 1 day = 7/129 + 5/172 = ( 28 + 15) /516 = 43/516 = 1/12

      ANSWER 12 days

    5. 3 men construct the in 43 days

      So 3 men’s work in a day = 1/43 part

      Hence 1 man’s work in day = 1/(43 x 3) part

      Similarly 1 woman’s work in a day = 1/(43 x 4) part

      7 men and 5 women’s work = 7 x 1/ 43 x 3 + 5 x 1/ 43 x 4 =( 7 x4 + 5 x 3)/43 x 3 x 4

      = ( 28 +15)/ (43 x 12 ) = 43/(43 x 12) = 1/ 12 part

      So 7 men and 5 women take 12 days to construct the the all.

    6. 3 men = 4 women

      1 man = (4/3) women ,

      7 men + 5 women = (7×43+5)=433 women

      M1 =4, D1 = 43, M2 = 43/2, D2 =?

      and W1 = W2 = 1

      According to the formula,

      M1D1W2 = M2D2W1

      4 x43x1=(43/3)xD2 x1

      D2 = 3 x 4 = 12 days

    7. 3 men = 43 days
      one day work for 3 men = 1/43
      one day work for 1 man = 1/ 43*3
      one day work for 4 women =1/43
      one day work for 1 woman = 1/43*4
      for 7 men and 5 women one day work = 7( 1/43*3) +5(1/43*4)
      = 7/43*3+5/43*4
      taking LCM and simplifying this results comes to be 1/12
      that implies works will be done in 12 days not 16 please do correct it.

    8. 4 women=3 men
      1 women=3/4men
      5 women=3*5/4=15/4men
      now 7men and 5 women=7+15/4=43/4
      3 men complete the work=43
      1 men complete that work=43*3
      so now for 5 women and 7 men above see=43/4
      43/4 can complete it=43*3/43/4=12
      so the right answar is 12 days

  2. 4 women multiply 43 days =14.33 multiply days? 4 days multiply 43 days devided 14.33 women=12.0022days

  3. The chosen answer is wrong. Actual answer in option A (12 days)

    How?

    3 men does same work as 4 women in 43 days.

    multiply 3 and 4 and 43 for a supposed amount of total work (516).

    Now calculate how much work is done by 3 men in one day by dividing 516 by 43 (12). Then calculate one man work in one day by dividing 12 by 3 (4).

    Same (12) amount of work is done by 4 women in one day. so one women does 12/4 (3) in one day.

    now see there are 7 men and 5 women in the final team.
    total amount of work in one day will be

    7(4)+5(3) = 43

    Now divide total work (516) by total work in one day (43) to get the answer (12)

    Good luck

  4. the answer is 12 days . 3 men or 4 women can plough the field in 43 days
    3 men = 4 women
    1 man = 43
    women
    7 man = 283
    women
    7 men and 5 women = 5+283
    = 433
    women
    4 women can plough field in 43 days
    So,
    1 women can plough in = 43 × 4 days
    Hence,
    433
    women can plough = 43×4×343
    = 12 days

  5. the answer is 12 days . 3 men or 4 women can plough the field in 43 days
    3 men = 4 women
    1 man = 43
    women
    7 man = 28/3
    women
    7 men and 5 women = 5+28/3
    = 43/3
    women
    4 women can plough field in 43 days
    So,
    1 women can plough in = 43 × 4 days
    Hence,
    4/33 women can plough = (43×4×34)/3
    = 12 days

  6. Ans A is right, it took 12 days to construct the wall.
    men women days
    3/7 4/5 43

    so by cross multiplication
    7/3 + 5/4 +1/43
    1/43= 7/3 + 4/5
    1/43= 28 + 15/12
    1/43= 43/12 = 1/12 or 12 days ans

  7. 4 women = 3 men
    1 women = 3/4 men.
    5 women = (3 *5)/4 = 15/4 men.
    7 men + 5 women = 7 + 15/4 = 43/4 men.
    Now,
    3 men can complete the work in 43 days.
    1 men can complete it in = 43*3
    43/4 men can complete = (43*3)/(43 /4) = (43 * 3 *4)/43 = 12 days.

  8. 16 is Wrong
    3 men took 43 days so 1 man will take 43 x 3 = 129 days
    4 women took 43 days so 1 woman will take 43 x 4 = 172 days
    Taking LCM of 129 and 172 will give 516 (Total Work)
    Divide 516 by 129 = 4 (Work done by 1 man per day)
    Divide 516 by 172 = 3 (Work done by 1 woman per day)
    7 men = 4 x 7 = 28 (per day)
    5 women = 3 x 5 = 15 (per day)
    Total work = 28 + 15 = 43 ( per day)
    43 x 12 days = 516 (Total Work)

  9. 3men=4women
    1man=4/3 woman
    7men and 5women=(4/3*7+5)=43/3womens
    Now 4*43/ 43/3=4*3*43/43
    =12 is correct

  10. If 3 men do work =43 days
    Then 1 man will do same work in =43×3=129 days
    Same for women
    1 woman will do same work in =43×4= 172days
    Now
    5men and 7 women will do a work with efficiency/day = 5(1/129)+7(1/172)
    = (15+28)/516 =1/12

    So days taken will be 12 days

    So ur answer is wrong

  11. 3 men can complete it in 43 days, which means 1 man alone will take 3*43 days working at the rate of 1/(3*43) per day.
    4 women can complete it in 43 days, which means 1 women alone will take 4*43 days working at the rate of 1/(3*43) per day

    Now, 7 men and 5 women working together will work at the rate of 7*1/(3*43) + 5*1/(4*43) = 1/12 per day.

    Therefore, it will take 12 days for 7 men and 5 women to get it done

  12. 4 women=3 men 1 women=3/4men 5 women=3*5/4=15/4men now 7men and 5 women=7+15/4=43/4 3 men complete the work=43 1 men complete that work=43*3 so now for 5 women and 7 men above see=43/4 43/4 can complete it=43*3/43/4=12 so the right answar is 12 days