A. Raising low lying areas by dumping
B. Concreting
C. Both A. and B.
D. Neither A. nor B
Advertisement
Related Mcqs:
- If the grit in grit chambers is 4.5 million litres per day, its cleaning is done____________________?
- A. Manually B. Mechanically C. Hydraulically D. Electrically...
- The grit chambers of sewage treatment plants, are generally cleaned after__________________?
- A. 2 days B. 7 days C. 12 days D. 14 days...
- The recommended detention period for grit chambers is_______________?
- A. 1 minute B. 2 minutes C. 3 minutes D. 5 minutes...
- In a grit chamber of a sewage treatment plant ____________________?
- A. Flow velocity 0.15 m to 0.3 m/sec is kept B. Depth of 0.9 m to 1.20 m is kept C. One minute of detention period is kept D. All the above...
- For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is__________________?
- A. 16 m B. 20 m C. 24 m D. 30 m...
- The detention time (t) of a settling tank, may be defined as the time required for_________________?
- A. A particle to travel along its length B. A particle to travel from top surface to bottom sludge zone C. The flow of sewage to fill the tank D. None of these...
- ¾th or ¼th extra space is left in sewer pipes at maximum discharge for_________________?
- A. Low estimates of the average and maximum flows B. Large scale infiltration of storm water C. Unexpected increase in population D. All the above...
- Design period of 40 to 50 years is adopted for_________________?
- A. Branch sewers B. Main sewers C. Trunk sewers D. All the above...
- Sewer pipes need be checked for_________________?
- A. Minimum flow B. Maximum flow C. Both A. and B. D. None of these...
- The standard B.O.D. of water is taken for_________________?
- A. 1 day B. 2 days C. 3 days D. 5 days...