A. Manually
B. Mechanically
C. Hydraulically
D. Electrically
Related Mcqs:
- The grit and silt of the grit chambers, may not be used for_________________?
A. Raising low lying areas by dumping
B. Concreting
C. Both A. and B.
D. Neither A. nor B - The grit chambers of sewage treatment plants, are generally cleaned after__________________?
A. 2 days
B. 7 days
C. 12 days
D. 14 days - The recommended detention period for grit chambers is_______________?
A. 1 minute
B. 2 minutes
C. 3 minutes
D. 5 minutes - The density of population over 40 hectares is 250/hectare. If water supply demand per day is 200 litres and sewage discharge is 80% of water supply, the sewage flow in sewers of separate system, is_____________________?
A. 0.05552 cumec
B. 0.05554 cumec
C. 0.05556 cumec
D. 0.0556 cumec - In a grit chamber of a sewage treatment plant ____________________?
A. Flow velocity 0.15 m to 0.3 m/sec is kept
B. Depth of 0.9 m to 1.20 m is kept
C. One minute of detention period is kept
D. All the above - For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is__________________?
A. 16 m
B. 20 m
C. 24 m
D. 30 m - To prevent settling down of sewage both at the bottom and on the sides of a large sewer, self-cleaning velocity recommended for Indian conditions, is_________________?
A. 0.50 m/sec
B. 0.60 m/sec
C. 0.70 m/sec
D. 0.75 m/sec - The sewage discharge in a detritus tank of a treatment plant is 576 litres/sec with flow velocity of 0.2 m/sec. If the ratio of width to depth is 2, the depth is____________________?
A. 100 cm
B. 110 cm
C. 120 cm
D. 150 cm - In a sludge digestion tank if the moisture content of sludge V1 litres is reduced from p1 % to p2 % the volume V2 is____________________?
A. [(100 + P1)/(100 – P2)] V1
B. [(100 – P1)/(100 + P2)] V1
C. [(100 – P1)/(100 – P2)] V1
D. [(100 + P2)/(100 – P1)] V1 - The rate of accumulation of sludge per person per year, is_______________________?
A. 10 litres
B. 15 litres
C. 20 litres
D. 25 litres