A. Branch sewers
B. Main sewers
C. Trunk sewers
D. All the above
Advertisement
Related Mcqs:
- The design period in years for pumping plants, is___________________?
- A. 1 B. 2 to 3 C. 3 to 5 D. 5 to 10...
- The design period of sewage treatment works in normally_________________?
- A. 5 – 10 years B. 15 – 20 years C. 30 – 40 years D. 40 – 50 years...
- ¾th or ¼th extra space is left in sewer pipes at maximum discharge for_________________?
- A. Low estimates of the average and maximum flows B. Large scale infiltration of storm water C. Unexpected increase in population D. All the above...
- The detention time (t) of a settling tank, may be defined as the time required for_________________?
- A. A particle to travel along its length B. A particle to travel from top surface to bottom sludge zone C. The flow of sewage to fill the tank D. None of these...
- Sewer pipes need be checked for_________________?
- A. Minimum flow B. Maximum flow C. Both A. and B. D. None of these...
- The standard B.O.D. of water is taken for_________________?
- A. 1 day B. 2 days C. 3 days D. 5 days...
- The grit and silt of the grit chambers, may not be used for_________________?
- A. Raising low lying areas by dumping B. Concreting C. Both A. and B. D. Neither A. nor B...
- General energy equation holds for_________________?
- A. steady flow B. turbulent flow C. laminar flow D. non-uniform flow E. all of the above...
- Maximum permissible velocity 1.5 m/sec, is adopted in drains_______________________?
- A. With beds of rocks and gravels B. Lined with stones C. Both A. and B. D. Neither A. nor B....
- In areas where light rains are uniformly distributed throughout the year, the type of sewerage system to be adopted is_______________?
- A. Separate system B. Combined system C. Partially combined system D. None of these...
Advertisement